Almost every extension needs building regulations approval, even when it doesn't need planning permission. You apply through your council's building control team or a registered building control approver, using either full plans or a building notice. An inspector checks the work at set stages, and you get a completion certificate at the end, which you'll need when you sell.
Last updated November 2026

Planning permission decides whether you can build something and how it looks from outside. Building regulations decide how you build it: the structure, fire safety, insulation, drainage and ventilation. They're two separate approvals. A permitted development extension skips planning, but it still needs building regulations approval.
Not sure about the planning side? Read do you need planning permission for an extension.
Nearly all of them. The Planning Portal says that "most extensions of properties require approval under the building regulations" (Planning Portal). The main exception is a small conservatory or porch at ground level under 30 square metres, built to strict conditions. Our guide on choosing a conservatory or an extension covers those conditions.
You choose your building control body. That can be your local council's building control team or a private registered building control approver (GOV.UK). Both inspect the work and both can issue the final certificate. Fees vary between councils (Planning Portal), so ask for a quote before you apply.
| Full plans | Building notice | |
|---|---|---|
| What you send | Detailed drawings and specifications, checked before work starts | Less detail, usually no detailed drawings |
| Decision | Within five weeks, or up to two months if you agree | No formal approval |
| When you can start | Once you have approval, or earlier at your own risk | Two days after you submit the notice |
| How long it lasts | Three years from when you deposit the plans | Ask your building control body |
Sources: Planning Portal, full plans and Planning Portal, building notice.
We recommend full plans for any extension. Your builder works from checked drawings, so problems get fixed on paper instead of on site. Some councils insist on full plans where you build over or near a public sewer (Chichester District Council), which catches a lot of rear extensions.
The inspector visits at key stages. A typical list includes the foundations, the damp proof course and oversite concrete, drains before they're covered, and a final inspection at completion (Chichester District Council). Your builder books each visit. Work that gets covered up before an inspection may have to be opened up again.
The completion certificate proves the work meets building regulations. On a full plans application, you receive it within eight weeks of finishing if the work meets the standards (Planning Portal). For applications made from 1 October 2023, someone must send a completion notice to the council within five days of finishing before the certificate goes out (South Oxfordshire District Council).
Keep the certificate with your deeds. Without approval, you won't have the certificates of compliance you may need when you sell your home (GOV.UK).
On full plans, the decision comes within five weeks, or up to two months if you agree (Planning Portal). On a building notice, you can start two days after you submit it (Planning Portal). Either way, councils expect you to tell them at least two days before work starts (Manchester City Council). Submit building control as soon as your drawings are final, and it runs alongside planning instead of after it.
The person doing the work can be prosecuted and fined, and building control can make you pay to put faulty work right (GOV.UK). If work went ahead without approval, councils offer a regularisation certificate application to bring it into the system (Planning Portal). That usually means opening up finished work so the inspector can see it.
Registered electricians, gas engineers and window fitters can sign off their own work through a competent person scheme, so you don't apply separately for those parts (GOV.UK). Ask each trade for their certificate and keep it with the completion certificate.
Agree it in writing before work starts. The quote should say who submits the application, who books inspections and who sends the completion notice. Ask for party wall notices to be covered the same way. Read party wall agreements: when you need one and what it costs and how long an extension takes for how it all fits together.
No. Building control checks the work meets the regulations, such as structure, fire safety and insulation. Paint, tiling and the look of the finish sit between you and your builder.
Often, yes. It suits small, simple jobs. For anything with steel beams or new drains, full plans give you checked drawings before you spend money on site.
Normally, yes. Turning a garage into a habitable room needs approval. Our garage conversion guide covers what gets checked.
Ask the building control body that issued it. Councils keep records and can usually supply a copy.
Yes. Give your building control body at least two days' notice before work begins, even on a full plans application.
Run your numbers through the cost calculator, or ask for a free quote. Quotes come back within 3 to 5 working days and stay valid for 30 days.