Renovations

Full home renovations, handled by one team.

Tired houses reimagined as modern family homes across Bromsgrove and Birmingham. Design through to final clean, with no upfront payments.

A full renovation is a big undertaking, and the difference between a smooth project and a stressful one is almost always the team running it. MTR Developments manages whole house renovations and refurbishments from the first design conversation to the final clean.

We reconfigure tired layouts, open up living space, replace kitchens and bathrooms, and bring the electrics, heating, plastering and decoration up to a standard we would be happy to live with ourselves. One point of contact runs the whole thing, so you are never chasing five different trades.

There is no upfront payment on any of it. You pay in stages as the work progresses, which keeps everyone honest and gives you control.

Fully renovated detached family home by MTR Developments
The transformation

Before & after.

A 1930s detached house in Birmingham, rebuilt as a modern family home. Drag the slider to reveal the change.

Rear of a Birmingham house after a full renovation by MTR Developments Rear of the same house before renovation work started Before After
Drag
What we cover

What is included.

How it works

A clear process, start to finish.

01

Free consultation

We walk the property with you, understand the vision and talk through what the budget can do.

02

Design and quote

We plan the works, handle any planning and building control, and give you a clear, staged quote.

03

The renovation

One team manages every trade and material, keeps the site tidy and keeps you updated throughout.

04

Handover

We finish, clean and hand back a transformed home. You only pay for what is complete.

What it costs

Guide prices, before you ring anyone.

A whole house renovation is priced by area, not by room, because the trades run through the whole building in sequence.

Full renovation, standard finish£1,200 per m²
Premium finishadd 30%
Luxury finishadd 65%
New kitchen includedaround £14,000
Extra bathroom or en suitearound £8,500
Structural steels and knock throughfrom £4,500
Underfloor heating£85 per m²
Typical build time12 to 26 weeks

These are the same guide rates our cost calculator uses. They exclude VAT and professional fees, and they are a starting point rather than a quote. Your real price depends on the house, the ground, the access and the spec you pick, which is what the free survey is for.

Price your project
What moves the price

Where the money actually goes.

Renovations swing more than any other job we do, because the price depends on how far back you take the house.

How much comes out
Stripping to plaster, stripping to brick and stripping to a shell are three different projects. Taking it back further costs more at the start and far less in snagging, because nothing is hidden behind a skim coat.
Rewire and replumb
A house with a 1970s consumer unit and no earth bonding is a full rewire whatever else you do. Deciding that at the start lets us chase walls before plastering. Deciding it later means doing the plastering twice.
Hidden defects
Old houses hide things. Failed lintels over bay windows, bridged damp proof courses, rotten joist ends in a wet corner, chimney breasts removed with nothing holding up what remains. We open up and look before we price rather than loading the quote with contingency.
Asbestos
Anything built before 2000 can contain it, usually in textured coatings, insulation board around boilers and some floor tiles. We test before we disturb anything suspect. It is a day and a lab fee, and it is not negotiable.
Windows and the thermal envelope
Replacing windows, insulating a roof or dry lining an external wall changes the building's performance and brings regulations with it. Done in the right order with the rewire and the plastering, it is efficient. Done piecemeal, every trade comes back.
Whether you live in
Living in is cheaper on paper and slower in practice, because the site has to be made safe and clean every evening and work moves room by room. An empty house lets trades overlap. We will tell you honestly which one suits your job.
Planning and building regulations

The rules that decide what you can build.

Most internal renovation needs no planning permission. What it does need is the right notifications, and that is where unpermitted work bites later.

Planning permission
Not needed to move internal walls, replace a kitchen or bathroom, or redecorate. It is needed in a conservation area with an Article 4 direction for things as small as replacing windows, re-roofing, adding a porch or even repainting brickwork. In Birmingham eleven conservation areas carry Article 4 directions.
Listed buildings
A separate consent, and a serious one. Listed building consent covers internal work as well as external, and carrying out work that needs it without getting it first is a criminal offence. If your house is listed we establish that before anything is quoted.
Load bearing walls
Any wall coming out needs building control approval and a structural engineer's calculations. If the wall is shared with a neighbour, the Party Wall etc. Act applies on top and they need two months notice.
Electrics, Part P
A rewire, new circuits and consumer unit work are all notifiable. The work goes through a registered competent person or through building control, and you get a certificate at the end. Buyers' solicitors ask for it.
Windows and insulation, Part L
Replacement windows and doors have to meet current standards and be certified, either through a competent person scheme or building control. Insulating a roof or a wall as part of the job brings Part L requirements with it.
Heating and gas
Boiler and gas work has to be carried out by a Gas Safe registered engineer and notified. Unvented hot water cylinders carry their own qualification requirement.
Paperwork at the end
Every notifiable element produces a certificate. We hand the set over at completion, because the point at which you discover a previous owner did not is usually the week your buyer's solicitor asks.

Rules current at October 2026. Approved Documents L and F are both replaced on 24 March 2027 and the new Part L reaches extensions and conversions, not just new builds, so insulation standards will move. We check the position on your house at the survey rather than working from a rule of thumb.

See it done

A 1930s detached house taken back and rebuilt as a six bedroom family home. Six before and after sliders, a ten point scope of works and a room by room gallery.

View the case study
Good to know

Renovations questions, answered.

Often yes, by phasing the work room by room, though many clients prefer to move out for a full renovation. We plan the sequence around what suits you.

Yes. Reworking the layout is usually where the biggest gains are. We handle the structural side, the knock throughs and the building control sign off as part of the job.

We do. One point of contact manages every trade, orders the materials and runs the programme, so you are not left coordinating it yourself.

Correct. You pay in stages as the work progresses, never before it begins.

Sometimes. It depends how far back the house is going and whether the kitchen and a bathroom can stay running. Living in is slower because the site is made safe every evening and the trades cannot overlap. We will give you both programmes and prices and let you choose.

Strip out, then structure, then first fix for electrics and plumbing, then plastering, then second fix, then decoration, then flooring and finally kitchens and bathrooms. Getting that sequence wrong is what makes renovations overrun, and it is why we do not start a strip out before the design is settled.

Failed lintels over bay windows, chimney breasts taken out downstairs with nothing supporting the stack above, bridged damp courses behind raised patios, and junction boxes buried in ceilings. None of them are disasters. All of them are cheaper to find in week one than week ten.

If the house went up before 2000, it is worth testing before anything gets disturbed. Textured ceiling coatings are the usual one. It is a quick test and a lab fee, and it is far cheaper than finding out the wrong way.

Keep exploring

Related services.

Guides

Related guides.

Start your project

Let's talk about your project.

Tell us what you are planning and we will arrange a free, no obligation visit and quote. No upfront payment, ever.