Opening up a home is one of the most transformative things you can do, but it is also where you least want a corner cut. MTR Developments handles structural work across Bromsgrove and Birmingham, from removing a single wall to reshaping the whole ground floor.
We coordinate the structural engineer, install the steel beams, form the openings and get everything inspected and signed off by building control. Over 24 years we have made a lot of dark, boxy houses feel twice the size, safely and to the letter of the regulations.
There is no upfront payment on any of our work. You pay as the work progresses and never before.

We look at what you want to open up and talk through what is structurally possible.
We arrange the structural engineer and calculations, and give you a clear quote for the works.
One team installs the steels, forms the openings and makes good, working cleanly and safely.
Building control inspects and signs off the work, and you only pay for what is complete.
Structural work is the part of a job where a cheap quote costs the most. Here is what it actually involves.
These are the same guide rates our cost calculator uses. They exclude VAT and professional fees, and they are a starting point rather than a quote. Your real price depends on the house, the ground, the access and the spec you pick, which is what the free survey is for.
Two steels of the same length can be very different prices. These are the things that decide it.
Structural work does not usually need planning permission. It always needs building control, and often it needs your neighbour.
Rules current at October 2026. Approved Documents L and F are both replaced on 24 March 2027 and the new Part L reaches extensions and conversions, not just new builds, so insulation standards will move. We check the position on your house at the survey rather than working from a rule of thumb.
The case study shows a kitchen, dining and family room formed from two small rooms, with the original staircase kept and a new balustrade built around it.
Yes. We coordinate a structural engineer to produce the calculations and drawings, then build to them. You do not need to organise that separately.
Yes. Removing a load bearing wall and installing a steel beam to carry the load is one of our most common jobs. It is always designed by an engineer and signed off by building control.
We do. We arrange the inspections and the final sign off so the work is fully certified, which matters when you come to sell.
Correct. You pay in stages as the work progresses, never before it begins.
Usually one to two weeks from propping to plaster, plus the lead time on the steel and the engineer's calculations before we start. The noisy, dusty part is two or three days of it.
Only if your neighbour dissents or does not reply. Serve the notice, and if they consent in writing that is the end of it. If 14 days pass with no answer the Act treats it as a dispute and surveyors are appointed, which is why we serve early rather than late.
Yes for most knock throughs. The room is sheeted off, the dust is contained and the propping stays in for a few days. We agree which days will be loud so you can plan around them.
It is the designed bearing the end of a beam sits on, usually a concrete block, sized by the engineer to spread the load into the wall. Skip it, or guess the size, and you concentrate several tonnes onto brickwork that was never meant to take it. It is a cheap component and a serious one.
Tell us what you are planning and we will arrange a free, no obligation visit and quote. No upfront payment, ever.