The price you sign is the price you pay. Every extra priced on day one. Nothing paid upfront. How it works
Services All services ExtensionsKitchensBathroomsLoft ConversionsRenovationsStructural Work
About Our Work Cost CalculatorLoft Conversion CostsExtension CostsGuides
Areas All areas BromsgroveAlvechurchBarnt GreenBlackwellRedditchBirminghamKings NortonNorthfieldSelly OakSolihullHalesowen
Contact Get a free quote
Home / Guides / Conservatory or extension
Guide · Extensions

Conservatory or single storey extension: which should you build?

A conservatory costs less up front and can be exempt from building regulations, but only while it stays separated from the house by external quality doors and keeps its own heating. A single storey extension needs building regulations approval, which makes it a proper room you can open straight into your kitchen and use all year. If you want open plan living, build an extension.

Last updated November 2026

Conservatory or extension?: MTR Developments guide illustration

Does a conservatory follow the same planning rules as an extension?

Yes. Planning treats a conservatory the same as any other extension, whatever it's made from (Planning Portal). The same permitted development limits apply: 3 metres deep on a semi or terrace, 4 metres on a detached house, up to 4 metres high. Our planning permission guide covers the full list.

When is a conservatory exempt from building regulations?

The Planning Portal sets out the conditions (Planning Portal):

  • It's built at ground level and is less than 30 square metres in floor area.
  • It's single storey.
  • External quality walls, doors or windows separate it from the house.
  • Its glazing and any fixed electrics meet the building regulations for safety glazing and electrical work.

Councils add that any heating must be independent of the house, with its own temperature and on and off controls (Milton Keynes City Council).

What happens if you knock through to a conservatory?

Take out the doors between the house and the conservatory and it loses its exemption. It then has to meet the thermal efficiency and ventilation rules (Planning Portal), which a mostly glass structure struggles to do. Any new structural opening between the conservatory and the house needs building regulations approval, even when the conservatory itself is exempt (Planning Portal).

Many people want exactly that knock through. That's the point where an extension makes more sense.

How does a conservatory compare with an extension?

ConservatorySingle storey extension
Planning rulesSame permitted development limitsSame permitted development limits
Building regulationsOften exempt, under strict conditionsApproval needed
Opening into the houseKeeps external quality doors betweenCan open fully into the kitchen
HeatingIndependent of the houseRuns off your central heating
Year round useGlass gains heat in summer and loses it in winterInsulated like the rest of the house
Up front costLowerHigher

Which should you build?

Build an extension if you want an open plan kitchen diner, a room you'll use every day of the year, or space that adds a proper room to the house. Build a conservatory if you want a garden room on a tighter budget and you're happy to keep a door between it and the house.

If you're unsure, think about where the table goes. If you picture the new space as part of your kitchen, with no door in between, you want an extension. If you picture a separate room you step into from the garden doors, a conservatory does the job for less.

For extension prices by spec, read our extension cost guide. For approvals, see building regulations for an extension.

Is an extension worth the extra cost?

An extension costs more because you build it like the rest of the house: foundations, insulated walls, a proper roof and building control sign off. In return you get a room that holds a steady temperature, takes your central heating and opens straight onto your kitchen or living room. A conservatory saves money up front, but a door has to stay between it and the house to keep the exemption. Choose based on how you'll use the space in January, not in May.

Can you turn a conservatory into an extension later?

Yes, but you're building a new room in its place. Swapping a glass roof for a solid one, adding insulated walls and knocking through all bring building regulations into play. Talk to building control before you start, and expect the old base and frame to need checking. Often it's cleaner to take the conservatory down and build the extension properly.

Example: a semi in Selly Oak (illustration)

Illustration only. This is not a past MTR job.

You own a semi with a dated 1990s conservatory that's too hot in summer and too cold in winter. You want a kitchen diner that opens off the back of the house. Knocking through would cost the conservatory its exemption, so you take it down and build a 3 metre single storey extension under permitted development, with building regulations approval, roof lights and sliding doors.

For the timings, read how long an extension takes.

Good to know

Questions people ask.

Extending the house heating into the conservatory breaks the exemption condition. A separate heater with its own controls keeps it exempt.

Yes. Extensions, conservatories and outbuildings together can't cover more than half the land around the original house.

A porch at ground level under 30 square metres is normally exempt from building regulations, provided the glazing and electrics comply.

The building regulations exemption only covers conservatories under 30 square metres. Anything bigger needs approval like any other extension.

Yes, but both count towards the same allowances. The depth limit runs from the original rear wall and the half the land rule covers everything you add.

Only if the work affects a shared wall or digs foundations close enough to a neighbour's to trigger the rules. A conservatory on a semi or terrace often does.

Keep reading

Related guides.

Next step

Get a price for your job.

Run your numbers through the cost calculator, or ask for a free quote. Quotes come back within 3 to 5 working days and stay valid for 30 days.