Barnt Green grew around its railway station, which opened in 1846. The shape of the village still follows what happened next, and it splits neatly in two.
After the land sales of the 1890s the western side filled with low density three storey houses, built by architects for Birmingham businessmen and industrialists, on landscaped plots of an acre or more. The eastern flanks are different: higher density two storey housing in a more formal layout, laid out in the early 20th century after a land sale in 1919, with further growth through the second half of the century.
Those two halves want different things. The large detached houses on the western side suit substantial rear extensions, garden rooms and whole house renovations that open up generous but compartmented Edwardian layouts. The eastern housing is more often a loft conversion, a side return or a kitchen extension.
The village is excluded from the Green Belt, so the Green Belt extension limits do not apply inside the settlement boundary. The conservation area is the constraint that does apply, and it covers more of the village than people expect.
Every quote itemises the shell and each extra at the spec you pick. You pay nothing upfront, then in stages as the work is done.
Barnt Green Conservation Area was designated in December 2000 and comes in three sections: Shepley, Fiery Hill and Cherry Hill. Inside any of them you lose side extensions, two storey rear extensions, all roof enlargement rights and the deeper prior approval route.
Barnt Green is excluded from the Green Belt with its boundary drawn tightly around the built form, so the 40% and 140m² limits do not apply to houses inside it.
For a property in the Green Belt, adopted policy BDP4.4(c) of the Bromsgrove District Plan 2011 to 2030 treats an extension as acceptable in principle up to a 40% increase on the original dwelling, or up to a total floor space of 140m² counting the original house plus every extension. "Original" means the house as it stood on 1 July 1948, so anything added since then counts against the allowance.
The large western plots usually mean mature trees. On clay, a tree near the footprint pushes foundations well past a metre deep. We dig trial holes before we price so the number in your quote is the number.
Bromsgrove District Council decides planning here. North Worcestershire Building Control, the shared service run by Bromsgrove, Redditch and Wyre Forest councils, signs off the build.
The three part conservation area is the thing to check first. Because it is in sections rather than one block, two houses on the same road can sit on opposite sides of the boundary with completely different rights. The council publishes the map. Send us the address and we will look before the visit rather than after the drawings.
If you are inside it, a single storey rear extension at 3 or 4 metres usually still works under permitted development, but anything to the side, anything at two storeys and anything involving the roof needs a full application. So does a dormer, and the council will expect it to sit properly on the roof rather than fill it.
On the Edwardian and interwar stock the common project is opening up. These houses were built as a series of separate rooms with a hall running through, which is a lovely entrance and a poor kitchen. Taking out the wall between kitchen and dining room is a structural job with an engineer, a steel and building control, and it is the change that transforms the house.
It might be. The area was designated in December 2000 and covers three separate sections, Shepley, Fiery Hill and Cherry Hill, so neighbouring houses can fall either side of the line. The council publishes the boundary. Send us your address and we will check it before we visit.
A single storey rear extension of 3 or 4 metres usually remains permitted development. Side extensions, two storey rear extensions and all roof work need full planning permission, and the 8 or 6 metre prior approval route is not available on designated land.
The village is excluded from it. Properties outside the settlement boundary are in it, and policy BDP4.4(c) then caps extensions at a 40% increase on the original dwelling or 140m² of total floor space.
Mature trees and clay soil are the combination to watch. It usually means deeper foundations, sometimes considerably deeper. We dig trial holes at survey stage so it is priced rather than discovered.
Yes. We prepare the drawings, submit to Bromsgrove District Council, arrange the structural calculations and book building control, so you deal with one team throughout.
That is most of what we do here. It needs a structural engineer to size the beam, building control approval and a week of propping, and it changes how the whole ground floor works.
No. The visit and quote are free, and your itemised quote comes back within 3 to 5 working days.
Tell us what you have in mind and we will book a free visit. Your itemised quote comes back within 3 to 5 working days.