Most loft conversions don't need planning permission. Under permitted development you can add up to 40 cubic metres to a terraced house and 50 cubic metres to other houses, as long as nothing goes past the front roof slope or above the existing roof. Every loft conversion needs building regulations approval, which covers the new floor, fire safety and stairs.
Last updated November 2026

According to the Planning Portal, a loft conversion counts as permitted development when:
A mansard usually rebuilds the front slope as well as the back, so plan for a householder application. Our planning permission guide explains the fees and timescales.
Illustration only. This is not a past MTR job.
You own a terrace in Kings Norton and want a rear dormer 4 metres wide, 2.4 metres high and 3.5 metres deep. A dormer sits on a sloping roof, so a rough volume is width times height times depth, halved: 4 × 2.4 × 3.5 ÷ 2 is about 16.8 cubic metres. That leaves room inside the 40 cubic metre terrace allowance. Your architect calculates the exact figure from the drawings, including any earlier roof extension.
Yes, every time you turn a loft into a liveable room (Planning Portal). Building control checks that the new floor is strong enough, that the roof stays stable, and that you can escape safely in a fire. The Planning Portal also gives 2.2 metres as the minimum height a loft conversion needs (Planning Portal).
For how approval works, read our guide to building regulations, full plans and building notices.
A loft adds a storey, and the Planning Portal says it's too dangerous to escape through windows from floors above first floor level (Planning Portal). So the stairs become your escape route, and the rules protect them:
That's why open plan ground floors need extra thought before a loft goes in.
You need a proper fixed stair to the new rooms. Retractable ladders and stairs aren't normally acceptable (Planning Portal). Where a full traditional stair won't fit, a space saving stair may be an option. Where the stair lands decides how much of your first floor changes, so settle it early.
Fire and structure get the attention, but the list runs wider. Redbridge Council's building control guidance covers the main extras (Redbridge Council):
A permanent fixed stair, a new floor or lined walls and rafters all make it a loft conversion in building control's eyes, so you can't sidestep approval by calling it storage.
Usually. The steel beams in most dormer and hip to gable conversions sit in the shared wall with next door, which needs party wall notice. The firewall in a shared loft is also a party wall (Planning Portal). See party wall agreements: when you need one and what it costs.
For prices by loft type, read our loft conversion cost guide.
It isn't compulsory, but it gives you written proof the loft was permitted development. Buyers' solicitors often ask for it.
Not under permitted development where the front faces a road. A front dormer needs a householder planning application.
Yes, if you turn the loft into a liveable room. Roof windows alone don't change that.
Flats and maisonettes have no permitted development rights for loft conversions, so you need planning permission.
A permitted development loft needs no planning application. A lawful development certificate usually comes back within 8 weeks, and building control decides full plans within five weeks.
Run your numbers through the cost calculator, or ask for a free quote. Quotes come back within 3 to 5 working days and stay valid for 30 days.