Pick the builder whose written quote is the most complete, not the cheapest. A good quote lists every item with a price, says who handles building control and party wall notices, and sets out when you pay. Check work they've done, their insurance and who will run your job day to day before you sign anything.
Last updated November 2026

Three gives you a fair comparison without months of site visits. Send every builder the same drawings and the same spec, or you'll compare three different jobs. If one quote comes in far below the others, find out what it leaves out before you get excited.
At MTR, quotes come back within 3 to 5 working days and stay valid for 30 days. Each job gets priced in Budget, Mid and High spec tiers, with one price per tier, so you see what a better finish costs before you commit.
A low quote often hides gaps. Provisional sums, vague allowances for kitchens or flooring, and missing items like skips, drainage or making good all turn into extras once work starts. By then you can't walk away. Line the quotes up item by item and add the gaps to the cheap one before you compare totals.
Pay in stages tied to work that's done, such as foundations, walls up, roof on and completion. Avoid handing over a large sum before anything happens on site. MTR takes nothing upfront and prices every extra on day one, so the price you sign is the price you pay.
A good builder gives you time to think and answers questions in writing.
The scope and spec, the price, the payment stages, the start date and programme, and how changes get agreed. Insist that any change gets priced in writing before the work happens. Agree how snagging gets handled at the end, and who provides which certificates: the building control completion certificate plus the electrical and gas certificates.
Read building regulations for an extension for what those certificates are, and party wall agreements for the neighbour side.
| Check | What to look for |
|---|---|
| Scope | Every item from the drawings appears, with nothing vague |
| Spec | Kitchens, flooring and glazing named, not just allowances |
| Exclusions | Listed clearly, with prices where possible |
| Approvals | Who handles building control and party wall notices |
| Payments | Staged against finished work |
| Programme | A start date and a rough timeline |
Score each quote against the same list. The one with the fewest gaps usually ends up the cheapest overall.
For a sense of timescales before that visit, read how long an extension takes. For a guide figure, use the cost calculator.
A quote is a fixed price for the work it describes. An estimate is a best guess that can change. Ask for a written quote before you sign.
Paying in stages tied to finished work protects you. Be wary of any builder who wants a large sum before starting.
Ask for the change to be priced in writing and agree it before the work happens. That stops surprises on the final bill.
MTR is Bromsgrove based and covers nearly all of Birmingham. Send the quote form with your postcode and we'll confirm.
Many builders coordinate it with a designer. Either way, the quote should say who submits planning, building control and party wall notices.
A few working days for a typical extension or renovation. MTR quotes come back within 3 to 5 working days of the site visit.
Run your numbers through the cost calculator, or ask for a free quote. Quotes come back within 3 to 5 working days and stay valid for 30 days.