How to choose a builder in Birmingham: questions to ask before you sign

Pick the builder whose written quote is the most complete, not the cheapest. A good quote lists every item with a price, says who handles building control and party wall notices, and sets out when you pay. Check work they've done, their insurance and who will run your job day to day before you sign anything.

Last updated November 2026

How to choose a builder: MTR Developments guide illustration

How many quotes should you get?

Three gives you a fair comparison without months of site visits. Send every builder the same drawings and the same spec, or you'll compare three different jobs. If one quote comes in far below the others, find out what it leaves out before you get excited.

What should a written quote include?

  • The full scope, line by line, so you can see what's in and what isn't.
  • The spec level for fittings and finishes.
  • Any exclusions, and prices for likely extras.
  • Who submits building control, books inspections and serves party wall notices.
  • A start date, a rough programme and how changes get priced.
  • The payment stages.
  • How long the price stays valid.

At MTR, quotes come back within 3 to 5 working days and stay valid for 30 days. Each job gets priced in Budget, Mid and High spec tiers, with one price per tier, so you see what a better finish costs before you commit.

Why can the cheapest quote end up costing more?

A low quote often hides gaps. Provisional sums, vague allowances for kitchens or flooring, and missing items like skips, drainage or making good all turn into extras once work starts. By then you can't walk away. Line the quotes up item by item and add the gaps to the cheap one before you compare totals.

How should you pay a builder?

Pay in stages tied to work that's done, such as foundations, walls up, roof on and completion. Avoid handing over a large sum before anything happens on site. MTR takes nothing upfront and prices every extra on day one, so the price you sign is the price you pay.

What should you check about the builder?

  • Work you can see. Ask for addresses of finished jobs, or photos with dates, and talk to those homeowners if you can.
  • Insurance. Ask for proof of public liability insurance and check the dates.
  • Who runs your job. Find out who'll be on site each day and who you call with a problem.
  • How many jobs they run. A builder juggling ten sites gives yours less attention. MTR runs one or two builds at a time.
  • Experience. Ask how long they've done this kind of work. Paul, who runs MTR, has over 24 years of building experience.

What are the red flags?

  • No written quote, or a quote that's one line long.
  • Pressure to sign today, or a price that "ends this week".
  • A big deposit before any work starts.
  • A discount for cash with no paperwork.
  • No mention of building control, planning or party wall notices.
  • Reluctance to show you finished work.

A good builder gives you time to think and answers questions in writing.

What should the contract cover?

The scope and spec, the price, the payment stages, the start date and programme, and how changes get agreed. Insist that any change gets priced in writing before the work happens. Agree how snagging gets handled at the end, and who provides which certificates: the building control completion certificate plus the electrical and gas certificates.

Read building regulations for an extension for what those certificates are, and party wall agreements for the neighbour side.

How do you compare quotes side by side?

CheckWhat to look for
ScopeEvery item from the drawings appears, with nothing vague
SpecKitchens, flooring and glazing named, not just allowances
ExclusionsListed clearly, with prices where possible
ApprovalsWho handles building control and party wall notices
PaymentsStaged against finished work
ProgrammeA start date and a rough timeline

Score each quote against the same list. The one with the fewest gaps usually ends up the cheapest overall.

What should you ask at the first visit?

  1. Have you built this type of job before, and can I see one?
  2. Do I need planning permission, and who handles it?
  3. Who submits building control and books the inspections?
  4. Will this need party wall notice?
  5. When could you start, and how long will it take?
  6. How do you price extras and changes?
  7. When do I pay, and how much each time?

For a sense of timescales before that visit, read how long an extension takes. For a guide figure, use the cost calculator.

Good to know

Questions people ask.

A quote is a fixed price for the work it describes. An estimate is a best guess that can change. Ask for a written quote before you sign.

Paying in stages tied to finished work protects you. Be wary of any builder who wants a large sum before starting.

Ask for the change to be priced in writing and agree it before the work happens. That stops surprises on the final bill.

MTR is Bromsgrove based and covers nearly all of Birmingham. Send the quote form with your postcode and we'll confirm.

Many builders coordinate it with a designer. Either way, the quote should say who submits planning, building control and party wall notices.

A few working days for a typical extension or renovation. MTR quotes come back within 3 to 5 working days of the site visit.